The required changes that have been completed to-date include;
Creation of a distinct camping ground area with 21 formalised campsites;
Creation of a separate day use area along the foreshore for the use of local residents and visitors;
Increased public car parking along the foreshore;
Removal of dangerous trees;
Removal of old picnic tables and concrete BBQs;
Improved fire break access;
Improved road and paths networks;
Improved drainage works;
Revegetation works;
Existing water line upgrade and a new common water tap installed;
Inclusion of a camp fire extinguisher; and
Installation of a temporary self-registration box.
Further required changes to be completed, subject to various external party approvals include the following;
Construction of an information and self-registration station;
Provision of camp ground signage;
Reserve burn off;
Further dangerous and road pinch point trees removed;
Reinstalment of Jetty;
Installation of landscape furniture (i.e. picnic tables) for day use areas.