Council on the 8 March 2017 resolved to support the findings of the Gnarabup/Prevelly Second Access Feasibility Report, specifically with Option 2 being the preferred option.
Main Roads have now advised that the Feasibility Report is complete and will be sent to the Minister for Transport for their consideration.
Council on the 8 March 2017 resolved to support the findings of the Gnarabup/Prevelly Second Access Feasibility Report, specifically with Option 2 being the preferred option.
Main Roads have now advised that the Feasibility Report is complete and will be sent to the Minister for Transport for their consideration.
-
Consultation results
Share on Facebook Share on Twitter Share on Linkedin Email this linkConsultation results have now been published! Download here.
-
Consultation Outcomes on Second Access Route Gnarabup/Prevelly
Share on Facebook Share on Twitter Share on Linkedin Email this linkThe Second Access Route was presented to the Council Meeting held on the 22 February 2017 and was deferred until the meeting of the 8 March 2017 to allow a site visit to be undertaken.
The background to this investigation was outlined in the previous Fact Sheet distributed as part of the wider community consultation from November 18 – December 16 2016. We asked our communities to provide their input into the options developed for Gnarabup and now present the consultation outcomes in this Fact Sheet. We thank everyone who provided input into this important study.
Feedback
The overall consultation process aimed to determine people’s views on:
· Whether a secondary fire access road was required;
· Which option they preferred; and
· Issues associated with each option.
The two most viable options from technical perspective were put forward:
· Option 2; a connection from Wallcliffe Road, Gnarabup to Rainbow Cave Road; and
· Option 3; a connection from Wallcliffe Road, Gnarabup to Blackboy Hollow Cave Road.
A total of 312 submissions were received, with 239 via hard copy and 73 via the website.
Photos
Key Dates
-
16 December 2016
Document Library
- Council Minutes 8 March 2017 (188 KB) (pdf)
-
Community Engagement December 2016
- April 2017 - Gnarabup Prevally Community Consultation Fact Sheet (91.2 KB) (pdf)
- Fauna Significance Assessment (4.26 MB) (pdf)
- Aboriginal Heritage Survey (2.59 MB) (pdf)
- Traffic Count Survey (1.65 MB) (pdf)
- Phytophthora Report (399 KB) (pdf)
- Level 1 Flora and Vegetation Survey at Gnarabup (2.15 MB) (pdf)
- Width Comparisons (76.9 KB) (pdf)
- Final Report Gnarabup/Prevelly Access Road
Life Cycle
-
Open
Second Access Route to Gnarabup/Prevelly has finished this stageThis consultation is Open for contributions.
-
Under Review
Second Access Route to Gnarabup/Prevelly is currently at this stageContributions to this consultation are closed for evaluation and review. The Project team will report back on key outcomes.
-
Final report
this is an upcoming stage for Second Access Route to Gnarabup/PrevellyThe final outcomes of the consultation are documented here. This may include a summary of all contributions collected as well as recommendations for future action.