Work is progressing well at the north entry to town.
Deep excavation is required to install the necessary stormwater infrastructure.
A shutter (pictured) is being used to safeguard the trench and workers from any potential collapse.
Stormwater pits are being are being installed along with several 1.2m diameter pipes.