Rec Centre Refurb

Share Rec Centre Refurb on Facebook Share Rec Centre Refurb on Twitter Share Rec Centre Refurb on Linkedin Email Rec Centre Refurb link

Margaret River’s well-loved Recreation Centre is set for a major renovation anticipated to start in September 2022, spurred by the need to address the severe structural deterioration of its pool roof. The project will be finished in 2024.

You can find project updates, answers to frequently asked questions, and other up-to-date information on this page.


What improvements will be delivered?

The ‘Rec Centre Refurb’ project will deliver a quality, durable and low maintenance building at the minimum cost possible.

  • New simplified skillion roof spanning the entire length of the existing building.
  • New café space at the facility entrance with outdoor play space for families to enjoy, surrounded by a timber-look deck.
  • Refurbished changerooms, new toilets, seating spaces, and public art will reinvent the facility’s feel, delivering a contemporary and functional centre that serves community members well into the future.
  • Key additional accessibility improvements include new accessible ramps at the centre’s entrance and reconstruction of the existing accessible toilets to current standards.

Please note this information was correct at the time of publishing.

Margaret River’s well-loved Recreation Centre is set for a major renovation anticipated to start in September 2022, spurred by the need to address the severe structural deterioration of its pool roof. The project will be finished in 2024.

You can find project updates, answers to frequently asked questions, and other up-to-date information on this page.


What improvements will be delivered?

The ‘Rec Centre Refurb’ project will deliver a quality, durable and low maintenance building at the minimum cost possible.

  • New simplified skillion roof spanning the entire length of the existing building.
  • New café space at the facility entrance with outdoor play space for families to enjoy, surrounded by a timber-look deck.
  • Refurbished changerooms, new toilets, seating spaces, and public art will reinvent the facility’s feel, delivering a contemporary and functional centre that serves community members well into the future.
  • Key additional accessibility improvements include new accessible ramps at the centre’s entrance and reconstruction of the existing accessible toilets to current standards.

Please note this information was correct at the time of publishing.

  • CLOSED: This survey has concluded.

    The Margaret River Recreation Centre is seeking expressions of interest for swimming lessons at Gnarabup Beach during Term 1 (1 February - 6 April 2023) while the Margaret River Recreation and Aquatic Centre Refurbishment project is underway. 

    If you have children who may be interested in participating in ongoing weekly lessons or an Intensive Aquatic Program (two weeks), please complete this short survey to help gauge interest as we plan our summer program. Have your say!

    Expressions of interest will close on Wednesday 30 November 2022. For more information, please contact Coordinator Recreation Services Seb Miller on smiller@amrshire.wa.gov.au or (08) 9780 5657.


    Take Survey
    Share Expressions of Interest: Beach Swimming Lessons - Term 1 2023 on Facebook Share Expressions of Interest: Beach Swimming Lessons - Term 1 2023 on Twitter Share Expressions of Interest: Beach Swimming Lessons - Term 1 2023 on Linkedin Email Expressions of Interest: Beach Swimming Lessons - Term 1 2023 link