Rec Centre Refurb
Share Rec Centre Refurb on Facebook
Share Rec Centre Refurb on Twitter
Share Rec Centre Refurb on Linkedin
Email Rec Centre Refurb link
The Rec Centre is now open!
The Centre officially opened on 25 March, with the pool opening on 22 April.
What improvements have been delivered?
The ‘Rec Centre Refurb’ project will deliver a quality, durable and low maintenance building at the minimum cost possible.
- New simplified skillion roof spanning the entire length of the existing building.
- New café space at the facility entrance with outdoor play space for families to enjoy, surrounded by a timber-look deck.
- Refurbished changerooms, new toilets, seating spaces, and public art will reinvent the facility’s feel, delivering a contemporary and functional centre that serves community members well into the future.
- Key additional accessibility improvements include new accessible ramps at the centre’s entrance and reconstruction of the existing accessible toilets to current standards.
Please note this information was correct at the time of publishing.
Page last updated: 26 Apr 2024, 01:56 PM